Genesis Software has completed a maintenance visit to NCU in Taiwan to effect repairs, recalibrate systems and finalise installation of systems deferred due to COVID restrictions.
A site visit to the Xingwu Weather station was performed to check equipment health and measure antenna impedance.
Repairs were effected to the meteor transmitter system to bring it back to full power operation.